top of page

PPJ Week 8 Joe

  • Writer: Hugo Armella
    Hugo Armella
  • Feb 28, 2018
  • 1 min read

This week I did the blocking out for level 2. After I finished blocking out the level I tested it out to make sure that the player was able to get through it all and when I found a place he couldn’t get by I made the appropriate edits. Now the level is complete and ready to be decorated. I also assist in the concepting of a few new levels. We discussed about what each level will consist of. My next task will be to design one of these levels in photoshop and eventually block it out in Unity as well.


 
 
 

Comments


Featured Posts

© 2017 by Zesty Bomb. Created with Wix.com

bottom of page